Case Studies
Home Shopping Network: Equipment Upgrades, Full Protection
The HSNI electrical facility is always standing ready to provide backup power to any and all of its several facilities covering the 67-acre campus.
Read This Case Study
Home Shopping Network
ConocoPhillips: Oil Refinery
Because the local utility power isn’t yet available when this particular refinery installs four new water pumps, ConocoPhillips requires generators that can be used as prime power to start up and run the pumps.
Read This Case Study
ConocoPhillips
Obama Inauguration: Flexibility, Security
Only six days before the event, the USSS doubles the scope of the project, adding more security checkpoints and security support for the Capitol and Lincoln Memorial venues.
Read This Case Study
Obama Inauguration
Ameren: Nuclear Power Plant Backup
Ameren turns to Kohler Rental for the backup generators to provide 6.2 megawatts of standby electric power.But the equipment plan is just a small part of a much larger effort.
Read This Case Study
Ameren
The Special Olympics Winter World Games
Special Olympics 2009 World Winter Games included large events in remote Idaho mountains and valleys, far from power sources and heated buildings.
Read This Case Study
Special Olympics
Fort Irwin: Military Logistics
Seeking a solution on an extremely accelerated schedule, Rockwell contacts Kohler Rental. While the job is large in scope, the timeline is the critical factor.
Read This Case Study
Ft Irwin
Shell Oil: Refining An Electrical Plan
As Shell's temporary power partner, Kohler Rental delivered continuous electrical power for eight weeks, 24x7, for a turnaround process, and the cokers were back in full operation as scheduled.
Read This Case Study
Shell Oil
Bonnaroo: Power for the People
Bonnaroo puts a premium on planning and experience. The first consideration is the remote location. If additional equipment is needed, trucking it in from Orlando takes about 20 hours.
Read This Case Study
Bonnaroo
National Talent Pool Designs Big Projects
As Kohler Rental continues to advance toward more centralized design, control and operations to focus on solutions for large-scale projects, four Kohler Rental veterans discussed collaboration, design and execution.
Read This Case Study
Big Projects
Extreme Makeover: Film Production and Construction
With television crews shooting 24/7 and with a clock counting down from 106 hours, every minute matters. There is no time for a power interruption, not even a hiccup.
Read This Case Study
Extreme Case Study
Harley Davidson Celebration:Brightest Show On Earth
Kohler Rental brought in over 5500 kilowatts of generator power, but that was the easy part.
Read This Case Study
Harley 100
Jamestown: An Event Fit for a Queen
The Anniversary Weekend in Jamestown was especially large, with 27 MW of power and infrastructure strung throughout 22 acres, including three primary entertainment venues.
Read This Case Study
JAMESTOWN
Kohler 'Chills' Millionaire's Row at Hot, Soggy Kentucky Derby
When skybox renovations at Churchill Downs displaced "Millionaire's Row" for the 2004 Kentucky Derby, 5,000 of the Derby's movers and shakers needed temporary seating and luxury hospitality.
Read This Case Study
Kentucky Derby